Simple Pay Application

Mississippi lien waiver forms and what the statute says

Mississippi prints two lien waiver forms in Miss. Code § 85-7-433: an interim waiver and release upon payment, and a waiver and release upon final payment. The same section prints a third form, the affidavit of nonpayment, which a claimant files when the payment named in a waiver never arrived.

Mississippi has no separate conditional and unconditional pair. The interim form stands where other States put their progress waiver, and the final form where they put the final one. In the app, a project located in Mississippi gets all three forms with the statute’s words unchanged, filled from the pay app the payment is for.

Sample Mississippi lien waiver on the statutory form
A filled sample of the interim waiver and release upon payment, § 85-7-433(1), printed by the app. The notary block is left blank.

The three Mississippi forms at a glance

Each form has its own subsection of § 85-7-433. The right-hand column quotes a line from the form itself that says what it releases or what it gives notice of. Those are the statute’s words, not ours.

FormSectionNearest kindThe form’s own words
Interim Waiver and Release upon PaymentMiss. Code § 85-7-433(1)Conditional, progress“UPON THE RECEIPT OF THE SUM OF $____, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS”
Waiver and Release upon Final PaymentMiss. Code § 85-7-433(2)Conditional, final“UPON THE RECEIPT OF THE SUM OF $____, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS”
Affidavit of NonpaymentMiss. Code § 85-7-433(3)Not a waiver“THE AMOUNT SET FORTH IN THE WAIVER AND RELEASE ($____) HAS NOT BEEN PAID, AND THE UNDERSIGNED HEREBY GIVES NOTICE OF THE NONPAYMENT.”

The interim form releases liens and bond rights through a date written on it, and it leaves out whatever rights the signer has in retained amounts. The final form has no date and no retained-amount exception: it releases for the labor or materials furnished to the contractor for the property. The affidavit releases nothing. It tells the owner that a sum named in an earlier waiver has not been paid.

The kind pages treat the interim form as Mississippi’s entry beside the conditional progress waiver, and the final form as its entry beside the conditional final waiver. That grouping is ours. The statute itself uses the words interim and final.

The sixty-day notice on each waiver

Both waiver forms end with a notice, and the notice is what sets Mississippi apart from the conditional forms of other States. It says that the signer is CONCLUSIVELY DEEMED TO HAVE BEEN PAID IN FULL THE AMOUNT STATED ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED THE PAYMENT, sixty days after the date stated on the form, unless an affidavit of nonpayment or a claim of lien is filed before the sixty days are over.

The notice also says what follows when it is left off: THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FACE OF THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER SECTION 85-7-419, MISSISSIPPI CODE OF 1972. The app prints the notice on both waiver forms, in the statute’s capitals.

The affidavit of nonpayment is the form that answers the notice. Its closing lines carry a mailing instruction: within two days of filing it, the filing party sends a copy to the owner of the property by registered or certified mail or statutory overnight delivery. Where the owner is an entity on file with the Secretary of State, a copy sent to the company’s address or its registered agent’s address on file there is treated as sufficient.

What the section says about using them

Statute
Miss. Code § 85-7-433
Use of the form
The section does not say. The notice on each form says a form without that notice is not enforceable as a waiver and release.
Who it applies to
The section names no limit.
Notary
Each waiver form and the affidavit of nonpayment carry a notary block.
Note
The notice on each waiver form says the claimant is treated as paid in full the amount stated 60 days after the date stated on the form, unless an affidavit of nonpayment or a claim of lien is filed before then (85-7-433(1), (2)). The affidavit form is offered here.

Source: Miss. Code § 85-7-433. As published by Justia, 2025 edition (FindLaw’s copy is the same), read Nov 12, 2026.

Two details of the forms bear on retainage and signing. The interim form excepts THOSE RIGHTS AND LIENS THAT THE MECHANIC AND/OR MATERIALMAN MIGHT HAVE IN ANY RETAINED AMOUNTS, so the retainage a GC holds back stays outside it. The final form carries no such sentence.

Each waiver form and the affidavit also has a notary block, a line for the notary to complete after the words SWORN TO AND SUBSCRIBED BEFORE ME. The final form prints its notice and then a second signature block with a second notary block. The app prints both, in the order the statute gives them. The section’s history line reads Laws, 2014, ch. 487, § 17; Laws, 2015, ch. 348, § 1, eff from and after July 1, 2015.

The full text of each form

Below is each Mississippi form as the app prints it, word for word. The blank lines are where the app writes the job’s details, and the headings inside each form are the statute’s own. Every form opens with the State and the county. The property is described by a metes and bounds description, a land lot district with block and lot number, or the street address of the project, and the app writes the street address.

Interim Waiver and Release upon Payment Miss. Code § 85-7-433(1), read Nov 12, 2026

INTERIM WAIVER AND RELEASE UPON PAYMENT

STATE OF MISSISSIPPI

COUNTY OF ____

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY ____ (NAME OF CONTRACTOR) TO FURNISH ____ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS ____ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF ____, COUNTY OF ____, AND IS OWNED BY ____ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

(DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $____, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND THROUGH THE DATE OF ____ (DATE) AND EXCEPTING THOSE RIGHTS AND LIENS THAT THE MECHANIC AND/OR MATERIALMAN MIGHT HAVE IN ANY RETAINED AMOUNTS, ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID BUILDING OR PREMISES.

____

SIGNATURE

BY: ____

(PRINT NAME)

ITS: ____

(PRINT TITLE)

SWORN TO AND SUBSCRIBED BEFORE ME, THIS THE ____ DAY OF ____, 20____.

____

NOTARY PUBLIC

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE BEEN PAID IN FULL THE AMOUNT STATED ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED THE PAYMENT, SIXTY (60) DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE EITHER AN AFFIDAVIT OF NONPAYMENT OR A CLAIM OF LIEN BEFORE THE EXPIRATION OF THE SIXTY-DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FACE OF THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER SECTION 85-7-419, MISSISSIPPI CODE OF 1972.

Waiver and Release upon Final Payment Miss. Code § 85-7-433(2), read Nov 12, 2026

WAIVER AND RELEASE UPON FINAL PAYMENT

STATE OF MISSISSIPPI

COUNTY OF ____

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY ____ (NAME OF CONTRACTOR) TO FURNISH ____ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS ____ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF ____, COUNTY OF ____, AND IS OWNED BY ____ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

(DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $____, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID PROPERTY.

____

SIGNATURE

BY: ____

(PRINT NAME)

ITS: ____

(PRINT TITLE)

SWORN TO AND SUBSCRIBED BEFORE ME, THIS THE ____ DAY OF ____, 20____.

____

NOTARY PUBLIC

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE BEEN PAID IN FULL THE AMOUNT STATED ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED THE PAYMENT, SIXTY (60) DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE EITHER AN AFFIDAVIT OF NONPAYMENT OR A CLAIM OF LIEN BEFORE THE EXPIRATION OF THE SIXTY-DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FACE OF THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER SECTION 85-7-419, MISSISSIPPI CODE OF 1972.

____

SIGNATURE

BY: ____

(PRINT NAME)

ITS: ____

(PRINT TITLE)

SWORN TO AND SUBSCRIBED BEFORE ME, THIS THE ____ DAY OF ____, 20____.

____

NOTARY PUBLIC

Affidavit of Nonpayment Miss. Code § 85-7-433(3), read Nov 12, 2026

AFFIDAVIT OF NONPAYMENT

STATE OF MISSISSIPPI

COUNTY OF ____

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY ____ (NAME OF CONTRACTOR) TO FURNISH ____ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS ____ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF ____, COUNTY OF ____, AND IS OWNED BY ____ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

(DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

PURSUANT TO SECTION 85-7-419 THE UNDERSIGNED EXECUTED A LIEN WAIVER AND RELEASE WITH RESPECT TO THIS PROPERTY DATED ____, ____. THE AMOUNT SET FORTH IN THE WAIVER AND RELEASE ($____) HAS NOT BEEN PAID, AND THE UNDERSIGNED HEREBY GIVES NOTICE OF THE NONPAYMENT.

THE ABOVE FACTS ARE SWORN TRUE AND CORRECT BY THE UNDERSIGNED.

____

SIGNATURE

BY: ____

(PRINT NAME)

ITS: ____

(PRINT TITLE)

SWORN TO AND SUBSCRIBED BEFORE ME, THIS THE ____ DAY OF ____, 20____.

____

NOTARY PUBLIC

WITHIN TWO (2) DAYS OF FILING THIS AFFIDAVIT OF NONPAYMENT, THE FILING PARTY SHALL SEND A COPY OF THE AFFIDAVIT BY REGISTERED OR CERTIFIED MAIL OR STATUTORY OVERNIGHT DELIVERY TO THE OWNER OF THE PROPERTY. WHENEVER THE OWNER OF THE PROPERTY IS AN ENTITY ON FILE WITH THE SECRETARY OF STATE'S OFFICE, SENDING A COPY OF THE AFFIDAVIT TO THE COMPANY'S ADDRESS OR THE REGISTERED AGENT'S ADDRESS ON FILE WITH THE SECRETARY OF STATE SHALL BE DEEMED SUFFICIENT.

The filled sample, field by field

The sample beside the introduction is the interim waiver for the first pay app of the demo drywall job, Maple Street Clinic: $25,650.00 of work, 5% retainage held, $24,367.50 due. The job is at 1450 Maple Street in Jackson. These are the blanks the app filled, and where each value came from.

Blank on the formSample valueWhere the app takes it from
County of (top of form)HindsThe project’s county
Name of contractorNorthgate Builders Inc.The party you bill on the project, usually the GC
Materials and/or laborDrywallThe project’s trade or scope
Title of the projectMaple Street ClinicThe project’s name
City and county of the projectJackson, HindsThe city typed on the waiver screen, and the project’s county
Name of ownerMaple Street Medical Partners LLCThe project’s owner
Property descriptionMaple Street Clinic, 1450 Maple Street, Jackson, MS 39201, in place of the bracketed promptThe project’s name and street address
Sum received$24,367.50The pay app’s current payment due
Through the date ofOctober 31, 2026The period end date of the pay app
Print name and titleDana Reyes, Office managerThe person who signs
Signature and notaryBlankLeft for the signer and the notary to complete

Making a Mississippi waiver here

  1. Create the project with Mississippi as its State. The interim form, the final form and the affidavit are the ones offered for it.
  2. Finish the pay app for the period. A finished pay app is frozen, so the waiver is built from figures that no longer move.
  3. Open Lien waivers and pick the form and the pay app. The sum, the date, the contractor, the owner and the property lines fill in.
  4. Check the filled blanks, then sign typed or drawn, or send a signing link to the person who signs.
  5. Download the PDF. The waiver and any backup files you attached go into the same file as the pay app, with the notary block printed for a notary to complete.
The pay app editor in the app, where the period’s billing is entered before the waiver is made

How the waiver follows the pay app

The sum on the interim waiver is the payment the pay app asks for, not the contract sum and not the work to date. Take the second pay app of the pay application guide’s drywall job, at 10% retainage, for the period to February 28, 2026. It shows $76,000.00 completed to date on a $120,000.00 contract, $7,600.00 of retainage held, and $23,085.00 certified on the first application. The current payment due is $45,315.00.

The interim waiver for that payment reads $45,315.00 as the sum and February 28, 2026 as the date. The $7,600.00 of retainage is outside the payment, and the interim form excepts retained amounts in its own words. When the retainage is paid at the end of the job, the final waiver is the form that goes with that payment. The retainage guide follows a release through a job.

Because the waiver is made from a finished pay app, the two papers cannot drift apart. A revised pay app makes a new version, and a new Mississippi waiver can be made from it. The pay application guide shows where the current payment due comes from, line by line.

Mississippi waiver questions

Does Mississippi have conditional and unconditional lien waivers?

Section 85-7-433 prints an interim waiver and release upon payment and a waiver and release upon final payment. Both release on receipt of a stated sum, and neither is split into a conditional and an unconditional version. The app groups the interim form with progress waivers and the final form with final waivers.

What happens sixty days after the date on a Mississippi waiver?

The notice on each waiver form says the claimant is treated as paid in full the amount stated, even if the payment never arrived, sixty days after the date stated on the form. The exception is an affidavit of nonpayment or a claim of lien filed before the sixty days end.

What is the affidavit of nonpayment?

A form in the same section, not a waiver. It names an earlier waiver by date, gives the amount stated in it, says that amount has not been paid and gives notice of the nonpayment. It is sworn and carries a notary block, and the app offers it with the two waiver forms.

Does a Mississippi lien waiver need a notary?

The section has no stand-alone rule on it. Each waiver form and the affidavit of nonpayment carry a notary block, and the app prints that block empty for a notary to complete.

Does the interim waiver release the retainage?

No. The interim form excepts the rights and liens the claimant might have in any retained amounts. The final form has no such exception and releases for the labor or materials furnished to the contractor for the property.

What if the notice is left off a Mississippi waiver?

The notice itself answers this: failing to include it on the face of the form makes the form unenforceable as a waiver and release under section 85-7-419. The app prints the notice on both waiver forms.

Is the statutory form mandatory in Mississippi?

Section 85-7-433 does not say. It calls the first form the one referred to in section 85-7-419, and the notice on each form says that a form without the notice is not enforceable.

What date does the app put on the interim waiver?

The period end date of the pay app the payment is for. The form reads through the date of, followed by that date, and the sum is the pay app’s current payment due.

Sources: Miss. Code § 85-7-433.

Other States and the four kinds

Beyond Mississippi, the lien waiver guide sets out the four kinds side by side, and conditional vs unconditional covers the timing. Two other States whose forms differ from Mississippi’s are Georgia, which also has an interim and a final form, and Missouri.

We print the statute’s wording and the facts above and say nothing about which waiver to sign.